Patches only contain the changes listed in the patch notes. For 4.1.2 Patch Level 2, see:
https://www.vaultwiki.org/articles/290/
Our policy is that new versions do not have any specific ETA but are instead every new version has a specific threshold:
- At least 3 weeks after the previous version release
- At least 10 changes in the changelog
- Fewer than 5 active bug reports on the web site, not counting: duplicates, cannot reproduce, or flagged for future.
- Any additional bugs that were found internally must be resolved
- If all of the above are okay, then a multi-day process begins:
-- Note that if at any point in this process, the above threshold is no longer met, the threshold must be met again before continuing.
-- New version notes (changelogs, style change info) must be posted to our documentation. If any additional bugs are encountered, they must be resolved before continuing.
-- We test upgrade in place on vBulletin 3, vBulletin 4, XenForo 1.x, and XenForo 2.x. If changes to the installer have been made, we additionally test install in place on vBulletin 4 and XenForo 2.x. If any additional bugs are encountered, they must be resolved before continuing.
-- We generate a package and upgrade from the package on vBulletin 4, XenForo 1.x, and XenForo 2.x. If any additional bugs are encountered, they must be resolved and new packages generated before continuing.
-- Wait 3 days. If any additional bugs are logged or reported, they must be resolved and new packages generated before continuing. There must be at least 3 days with no additional bugs logged, and 1 day with no additional bugs reported, before continuing.
-- Release the package and post an announcement.